|
Critical Areas Land Use Permit (LO) |
| Please Note: The following are the materials, fees, and timeline that typically apply to an application of this type. This information is a general guide and should not be used as a substitute for current codes and regulations. Before applying for a permit, contact Permit Processing (425-452-4898 or permittech@bellevuewa.gov) with your project details to verify that this is the correct application type and for any other submittal information. |
| Submittal Chart |
For definitions, numbers of copies to submit, and other important information.
Critical Areas Land Use Permit |
| Submittal Description Sheets |
1 Standards for Plans and Drawings 2 Boundary & Topographic Survey 3b Site Plan B 4 Statistical Information Sheet 10 Building Elevations 13 Foundation Plan 19 Stormwater Permitting for Construction Sites 20 Construction Stormwater Pollution Prevention Plan (CSWPPP) 25 Geotechnical Report 27 Environmental Checklist Cover Sheet 27a Environmental Checklist 41 Billing System 44 Slope Categories Drawing
(if slopes greater than 15% exist) |
| Forms and Other Information |
Application for Land Use Approval Bill To Land Use Review Process |
| Fees |
Shoreline, Environmental & Sensitive Area |
| Target Processing Timeline |
120 Calendar Days |
Actual Processing Timeline (updated weekly) |
Critical Areas Land Use Permit (LO) |