|
Clearing and Grading in Critical Areas (GH)
For activities conducted in a critical area or critical area buffer not combined with a building permit. Activities may include: hazardous tree removal, vegetation management plan, habitat improvement plan, noxious species removal, vegetation pruning and stream and shoreline stabilization measures. |
| Please Note: The following are the materials, fees, and timeline that typically apply to an application of this type. This information is a general guide and should not be used as a substitute for current codes and regulations. Before applying for a permit, contact Permit Processing (425-452-4898 or permittech@bellevuewa.gov) with your project details to verify that this is the correct application type and for any other submittal information. |
| Submittal Chart |
For definitions, numbers of copies to submit and other important information.
Commercial and Multifamily Clearing & Grading Permits |
| Submittal Description Sheets |
1 Standards for Plans & Drawings 2 Boundary & Topographic Survey 22b Final Landscape Plan 25 Geotechnical Report 26 Wetland Report 41 Billing System 27 Environmental Checklist Cover Sheet 27a Environmental Checklist Tree Pruning Guidelines - PDF, Flipbook |
| Forms |
Clearing & Grading Permit Application CSWPPP (Construction Stormwater Pollution Prevention Plan) Short Form for Small Construction Projects CSWPPP Long Form Hazardous Tree Form Bill To |
| Fees |
Clearing & Grading Permits |
| Target Processing Timeline |
63 Calendar Days |
Actual Processing Timeline (updated weekly) |
Landscape Vegetation (GH) |