|
Shoreline Variance (WF) |
| Please Note: The following are the materials, fees, and timeline that typically apply to an application of this type. This information is a general guide and should not be used as a substitute for current codes and regulations. Before applying for a permit, contact Permit Processing (425-452-4898 or permittech@bellevuewa.gov) with your project details to verify that this is the correct application type and for any other submittal information. |
| Submittal Chart |
For definitions, numbers of copies to submit, and other important information.
Shoreline Development |
| Submittal Description Sheets |
1 Standards for Plans and Drawings 2 Boundary & Topographic Survey 3b Site Plan B 4 Statistical Information Sheet 10 Building Elevations 20 Construction Stormwater Pollution Prevention Plan (CSWPPP) 31 Shoreline Variance Decision Criteria 41 Billing System |
| Forms |
Application for Land Use Approval Bill To |
| Fees |
Shoreline, Environmental & Sensitive Area Applications |
| Timeline |
To be discussed at Preapplication Conference |