|
Planned Unit Development (LK) |
| Please Note: The following are the materials, fees, and timeline that typically apply to an application of this type. This information is a general guide and should not be used as a substitute for current codes and regulations. Before applying for a permit, contact Permit Processing (425-452-4898 or permittech@bellevuewa.gov) with your project details to verify that this is the correct application type and for any other submittal information. |
| Submittal Chart |
For definitions, numbers of copies to submit, and other important information.
Preliminary Plat Approvals & Planned Unit Development |
| Submittal Description Sheets |
Presubmittal Conference Handout 1 Standards for Plans and Drawings 2 Boundary & Topographic Survey 3b Site Plan B 4 Statistical Information Sheet 9 Floor Plan 10 Building Elevations 19 Stormwater Permitting for Construction Sites 20 Construction Stormwater Pollution Prevention Plan (CSWPPP) 21 Road Plan 22a Preliminary Landscape Plan 23a Preliminary Street Lighting Plan 25 Geotechnical Report 27 Environmental Checklist 30 Planned Unit Development Plan Decision Criteria 41 Billing System 64 Bonding Process for Subdivisions (11"x17" sheet) |
| Forms and Other Information |
Application for Land Use Approvals Bill To Hazardous Tree Form Land Use Review Process |
| Fees |
Plats, PUD, Combinations, and Adjustment Applications |
| Target Processing Timeline |
Planned Unit Development (218 Calendar Days) |
Actual Processing Timeline (updated weekly) |
Planned Unit Development (LK)
|