Minor Project (BW) |
| Please Note: The following are the materials, fees, and timeline that typically apply to an application of this type. This information is a general guide and should not be used as a substitute for current codes and regulations. Before applying for a permit, contact Permit Processing (425-452-4898 or permittech@bellevuewa.gov) with your project details to verify that this is the correct application type and for any other submittal information. |
| Submittal Chart |
For definitions, numbers of copies to submit, and other important information.
Small Commercial, Multifamily, and Duplex Building Permits |
| Submittal Description Sheets |
1 Standards for Plans and Drawings 3a Site Plan A 9 Floor Plan (for buildings only) 10 Building Elevations (for buildings & attachments) 11 Cross Sections & Details (for buildings only) 12 Roof, Deck & Floor Framing (for buildings only) 13 Foundation Plan (for buildings only) 15 Structural Notes 20 Construction Stormwater Pollution Prevention Plan (if Clearing & Grading included in Permit) 25 Geotechnical Report 34b Commercial Energy Code Data Sheet (for buildings only) 47 Value of Improvements 55 Application Checklist 57 Underground Utility Infrastructure |
| Forms |
Building Permit Application (Commercial) (if permit includes demo, fill out in triplicate) Supplemental Application (if C/G is included) |
| Fees |
Commercial & Multifamily Construction Valuation Sheet (or use the Construction Valuation Table) |
| Target Processing Timeline |
28 Calendar Days |
Actual Processing Timeline (updated weekly) |
Minor Project (BW) |