|
Minor Clearing and Grading without Building Permit (GA)
For clearing and grading not combined with a building permit. Involves over 1,000 square feet of clearing and over 10 cubic yards of grading; or more than 50 cubic yards of grading regardless of clearing area. Also for construction of rockeries and modular block walls over four feet in height and slope stabilization measures. |
| Please Note: The following are the materials, fees and timeline that typically apply to an application of this type. This information is a general guide and should not be used as a substitute for current codes and regulations. Before applying for a permit, contact Permit Processing (425-452-4898 or permittech@bellevuewa.gov) with your project details to verify that this is the correct application type and for any other submittal information. |
| Submittal Chart |
For definitions, numbers of copies to submit, and other important information.
Clearing & Grading Single-Family |
| Submittal Description Sheets |
1 Standards for Plans and Drawings 2 Boundary & Topographic Survey 3b Site Plan B 19 Stormwater Permitting for Construction Sites 20 Construction Stormwater Pollution Prevention Plan (CSWPPP) 25 Geotechnical Report 26 Wetland Report (if wetlands exist) |
| Forms |
Clearing & Grading Permit Application CSWPPP (Construction Stormwater Pollution Prevention Plan) Short Form for Small Construction Projects CSWPPP Long Form |
| Fees |
Clearing & Grading Permits |
| Target Processing Timeline |
14 Calendar Days |
Actual Processing Timeline (updated weekly) |
Minor Clearing & Grading without Building Permit (GA) |