Major Project

Major Project (BB)

Please Note: The following are the materials, fees, and timeline that typically apply to an application of this type. This information is a general guide and should not be used as a substitute for current codes and regulations. Before applying for a permit, contact Permit Processing (425-452-4898 or permittech@bellevuewa.gov) with your project details to verify that this is the correct application type and for any other submittal information. 
Submittal Chart For definitions, numbers of copies to submit, and other important information.

Large Commercial, Multifamily and Duplex Building Permits

Submittal Description Sheets Presubmittal Conference Handout
1 Standards for Plans and Drawings
2 Boundary & Topographic Survey
3b Site Plan B
9 Floor Plan
10 Building Elevations
11 Cross Sections and Details
12 Door, Window, Finish Schedules, Roof, Deck, and Floor Framing Plans
13 Foundation Plan
15 Structural Notes
20 Construction Stormwater Pollution Prevention Plan (CSWPPP)
21 Road Plan
22b Final Landscape Plan - Exterior Lighting Plan
23a Preliminary Street Lighting Plan
23b Street Lighting Plan
25 Geotechnical Report
34a Residential Energy Code Data Sheet  (Multi-family only) Go to Climate Zone 1 for all forms
34b Commercial Energy Code Data Sheet  (Commercial only)
41 Billing System
42a Conceptual Smoke Control Submittal
42b Detailed Smoke Control Submittal
42c Smoke Control System Revisions
42d Shaft Pressurization-Only Systems
44 Slope Categories Drawing  (if slopes greater than 15%)
Forms Building Permit Application
Bill To
Electrical Plan Review Submittal Guide/Checklist
Demolition/Abandonment of Water/Sewer Service  (if permit includes demo, fill out in triplicate)
ISD Impact Fee Notification  (Multi-family project only)
2008 Electrical Code--Change Notice
Fees

Commercial & Multifamily Construction
Valuation Sheet    (or use the Construction Valuation Table)

Target Processing Timeline 240 Calendar Days
Actual Processing Timeline
(updated weekly)
Major Project (BB)

Contact Information

Permit Processing
450 110th Ave NE
P.O. Box 90012
Bellevue, WA 98009
Phone: 425-452-4898, Assistance for the hearing impaired: dial 711
E-mail: PermitTech@bellevuewa.gov
Business Hours: 8 a.m. to 4 p.m., weekdays (Wednesday, 10-4)


Contact Us