Design Review (LD) |
| Please Note: The following are the materials, fees, and timeline that typically apply to an application of this type. This information is a general guide and should not be used as a substitute for current codes and regulations. Before applying for a permit, contact Permit Processing (425-452-4898 or permittech@bellevuewa.gov) with your project details to verify that this is the correct application type and for any other submittal information. |
| Submittal Chart |
For definitions, numbers of copies to submit, and other important information.
Design Review Approvals, Preliminary SEPA, Variances |
| Submittal Description Sheets |
1 Standards for Plans and Drawings 2 Boundary & Topographic Survey 3b Site Plan B 9 Floor Plan 10 Building Elevations 18 Proposal Information 20 Construction Stormwater Pollution Prevention Plan (CSWPPP) 21 Road Plan 22a Preliminary Landscape Plan 23a Preliminary Street Lighting Plan 25 Geotechnical Report 27 Environmental Checklist 41 Billing System 54 Sign Master Plan |
| Forms and Other Information |
Application for Land Use Approval Bill To Land Use Review Process |
| Fees |
Land Use Approvals |
| Target Processing Timeline |
266 Calendar Days |
Actual Processing Timeline (updated weekly) |
Design Review (LD) |