Clearing and Grading Without SEPA

Clearing & Grading
without SEPA (GD)

Please Note: The following are the materials, fees, and timeline that typically apply to an application of this type. This information is a general guide and should not be used as a substitute for current codes and regulations. Before applying for a permit, contact Permit Processing (425-452-4898 or permittech@bellevuewa.gov) with your project details to verify that this is the correct application type and for any other submittal information. 
Submittal Chart For definitions, numbers of copies to submit, and other important information.

Clearing & Grading Permits (Commercial & Multifamily)

Submittal Description Sheets 1 Standards for Plans and Drawings
2 Boundary & Topographic Survey
3b Site Plan B
19 Stormwater Permitting for Construction Sites
20 Construction Stormwater Pollution Prevention Plan (CSWPPP)
22b Final Landscape Plan
23b Street Lighting Plan
25 Geotechnical Report
26 Wetland Report (if wetlands exist)
41 Billing System
Forms

Clearing & Grading Permit Application
CSWPPP (Construction Stormwater Pollution Prevention Plan) Short Form for Small Construction Projects
CSWPPP Long Form
Bill To

Fees Clearing & Grading Permits
Target Processing Timeline 170 Calendar Days
Actual Processing Timeline
(updated weekly)
Clearing & Grading without SEPA (GD)