|
Clearing and Grading with SEPA (GC)
|
| Please Note: The following are the materials, fees, and timeline that typically apply to an application of this type. This information is a general guide and should not be used as a substitute for current codes and regulations. Before applying for a permit, contact Permit Processing (425-452-4898 or permittech@bellevuewa.gov) with your project details to verify that this is the correct application type and for any other submittal information. |
| Submittal Chart |
For definitions, numbers of copies to submit, and other important information.
Clearing and Grading Permits |
| Submittal Description Sheets |
1 Standards for Plans and Drawings 2 Boundary & Topographic Survey 3b Site Plan B 19 Stormwater Permitting for Construction Sites 20 Construction Stormwater Pollution Prevention Plan (CSWPPP) 22b Final Landscape Plan 23b Street Lighting Plan 25 Geotechnical Report 26 Wetland Report (if wetlands exist) 27 Environmental Checklist Cover Sheet 27a Environmental Checklist 41 Billing System |
| Forms |
Clearing and Grading Permit Application CSWPPP (Construction Stormwater Pollution Prevention Plan) Short Form for Small Construction Projects CSWPPP Long Form
|
| Fees |
Clearing and Grading Permits |
| Target Processing Timeline |
120 Calendar Days |
Actual Processing Timeline (updated weekly) |
Clearing and Grading with SEPA (GC) |