Conditional Use--Shoreline Management (WA) |
| Please Note: The following are the materials, fees, and timeline that typically apply to an application of this type. This information is a general guide and should not be used as a substitute for current codes and regulations. Before applying for a permit, contact Permit Processing (425-452-4898 or permittech@bellevuewa.gov) with your project details to verify that this is the correct application type and for any other submittal information. |
| Submittal Chart |
For definitions, numbers of copies to submit, and other important information.
Shoreline Development |
| Submittal Description Sheets |
1 Standards for Plans and Drawings 2 Boundary & Topographic Survey 3b Site Plan B 9 Floor Plan 10 Building Elevations 20 Construction Stormwater Pollution Prevention Plan (CSWPPP) 22a Preliminary Landscape Plan 27 Environmental Checklist Cover Sheet 27a Environmental Checklist 41 Billing System 44 Slope Categories Drawing (if slopes greater than 15% exist) |
| Forms |
Application for Land Use Approval Bill To |
| Fees |
Shoreline, Environmental & Sensitive Area Applications |
| Target Processing Timeline |
218 Calendar Days |
Actual Processing Timeline (updated weekly) |
Conditional Use--Shoreline Management (WA) |