|
Resolution Number |
Adopted Date |
Summary |
|
8000 |
11/2/09 |
Authorizing execution of a professional services agreement for the Sewer Lake line Replacement Project at Meydenbauer Beach Park, with Murray, Smith & Associates, Inc., in an amount not to exceed $205,000, for preliminary engineering design (CIP Plan No. S-58). |
|
8001 |
12/07/09 |
11/16 Postponed - Authorizing execution of a two-year contract, with an option to renew for two additional years with G4S Wackenhut for security services at General Government buildings for 2010-2011. |
|
8002 |
11/16/09 |
Authorizing execution of a two-year contract, with an option to renew for two additional years with SBS of America for custodial services at City Hall for 2010-2011. |
|
8003 |
11/16/09 |
Authorizing execution of a two-year contract, with an option to renew for two additional years with Buena Vista Services Inc. for custodial services at the Bellevue Service Center for 2010-2011. |
|
8004 |
11/16/09 |
Authorizing execution of a two-year contract, with an option to renew for two additional years with Whitman & Associates for carpet cleaning services at City Hall and the Bellevue Service Center for 2010-2011. |
|
8005 |
11/16/09 |
Authorizing execution of a two-year professional services agreement with Youth Eastside Services (YES), in the amount of $75,000, for youth and family counseling services at Crossroads Community Center. |
|
8006 |
11/16/09 |
Authorizing execution of a four-year General Services Contract with Blue-Sky Cleaners, in an annual amount of $30,000, for laundry, dry-cleaning, and alteration services for the Bellevue Police Department. |
|
8007 |
11/16/09 |
Authorizing execution of a five- year lease agreement with Delta Business Park, in the total amount of $78,086.40, for vehicle storage. |
|
8008 |
11/16/09 |
Authorizing execution of a professional services agreement for the Wilburton and Mid Lakes Sewer Capacity Study, with HDR Engineering, Inc. for engineering services, in an amount not to exceed $75,000 (CIP Plan No. S-60). |
|
8009 |
11/16/09 |
Declaring certain utility-owned equipment to be surplus and directing City staff to dispose of the property in the same manner as other City-owned personal property that has met its usefulness and is no longer needed by the City. |
|
8010 |
11/16/09 |
Authorizing execution of a contract with The Gordian Group for consulting services in the development and implementation of a Job Order Contracting (JOC) program in Bellevue. |
|
8011 |
12/07/09 |
Authorizing the City Manager or his designee to execute a two year agreement with Pacific Northwest Title for title and escrow services, in an amount not to exceed $150,000, with an option to renew for an additional two year period for a total contract amount not to exceed $300,000. |
|
8012 |
12/07/09 |
Authorizing the City Manager or his designee to execute the ORCA card agreement with King County for the purchase and distribution of the annual 2010 ORCA cards (previously referred to as FlexPasses) to City of Bellevue employees. |
|
8013 |
12/07/09 |
Authorizing execution of a two-year banking services agreement with Bank of America, N.A. for general banking services in an estimated total amount of $679,000 for the two-year term, with an option to extend the contract for an additional two years. |
|
8014 |
12/07/09 |
Authorizing execution of a contract with Elite Landscaping Inc. in an amount not to exceed $100,000.00, plus all applicable taxes, for city-wide on-call parking lot, sidewalk, and walkway snow removal and de-icer services. |
|
8015 |
12/07/09 |
Authorizing execution of a contract with Santana Trucking & Excavating Inc. in an amount not to exceed $100,000.00, plus all applicable taxes, for city-wide on-call parking lot, sidewalk, and walkway snow removal and de-icer services. |
|
8016 |
12/07/09 |
Authorizing execution of a one-year administrative services contract with Premera Blue Cross to administer the City’s self-insured medical and prescription drug benefit programs for 2010. |
|
8017 |
12/07/09 |
Authorizing execution of an agreement with the Boys and Girls Club of Bellevue (BGCG), in an amount up to $86,500, to continue the operation of the Ground Zero Teen Center and BGCB satellite sites in partnership with the City. |
|
8018 |
12/07/09 |
Authorizing the City Manager or his designee to execute Amendment No. 2 to the Marymoor Park Interlocal Agreement with King County, in an amount not to exceed $170,000 for a three-year term, for the maintenance and operation of the Bellevue/King County Marymoor Ballfield Complex. |
|
8019 |
12/07/09 |
Authorizing the execution of a professional services agreement with RH2 Engineering, Inc., for engineering services to perform the West Operating Area Storage Capacity Study in an amount not to exceed $65,000 (CIP Plan No. W-103). |
|
8020 |
12/07/09 |
Authorizing the execution of a professional services agreement with Tetra Tech for engineering services to perform the Sewer Lake Line Replacement Preliminary Study for Lake Washington in an amount not to exceed $105,000 (CIP Plan No. S-58). |
|
8021 |
12/07/09 |
Authorizing the City Manager or his designee to Execute a Funding Agreement with Performing Arts Center Eastside (“PACE”) in an amount not to exceed $2,000,000 from the Cultural Arts Funding Earmark in the 2009-2010 Budget. |
|
8022 |
12/07/09 |
Providing for the banking of levy capacity pursuant to RCW 84.55.092. |
|
8023 |
12/14/09 |
Authorizing approval of payment of $27,376.65 for a Release of All Claims in final settlement of a claim against the City for property damage to Puget Sound Energy equipment caused by a motor vehicle incident. |
|
8024 |
12/14/09 |
Authorizing execution of a four-year agreement for public defense services with Stein, Lotzkar and Starr, P.S., Inc., in the estimated amount of $579,696, for the first year to provide public defense services to indigent defendants accused of misdemeanor. |
|
8025 |
12/14/09 |
Authorizing execution of an agreement with Broadstripe which allows the phasing out of cable operations in the City over a period of time. |
|
8026 |
12/14/09 |
Canceling City warrants not presented for payment within a minimum of one year of issuance and directing the transfer of all records of such warrants. |
|
8027 |
12/14/09 |
Repealing Resolution No. 8022-D and providing for the banking capacity of levy capacity pursuant to RCW 84.55.092. |
|
8028 |
12/14/09 |
Authorizing execution of a one-year contract with Ski’s Painting, Inc., with the option for an additional three-year renewal, in an amount not to exceed $240,000, for city-wide on-call painting services. |
|
8029 |
12/14/09 |
Authorizing execution of a one-year contract with Washington Industrial, with the option for an additional three-year renewal, in an amount not to exceed $240,000, for city-wide on-call painting services. |
|
8030 |
12/14/09 |
Authorizing execution of a one-year contract with Ellis Construction, Inc., with the option for an additional three-year renewal, in an amount not to exceed $240,000, for city-wide on-call painting services. |
|
8031 |
12/14/09 |
Authorizing execution of a one-year contract with Cortina’s Painting & Restoration, with the option for an additional three-year renewal, in an amount not to exceed $240,000, for city-wide on-call painting services. |
|
8032 |
12/14/09 |
Authorizing execution of a two-year professional services contract with Tri-Med Ambulance to provide Basic Life Support non-emergency patient transport services, with an option to renew for two additional one-year terms. |
|
8033 |
12/14/09 |
Authorizing execution of a general services contract up to four years with Teufel Landscape, in an amount not to exceed a potential total of $162,918.18, for maintenance at six natural resource sites. |
|
8034 |
12/14/09 |
Authorizing execution of a general services contract up to four years with Plantscapes, in an amount not to exceed a potential total of $108,900, for maintenance at four natural resource sites. |
|
8035 |
12/14/09 |
Authorizing execution of a general services contract up to four years with Teufel Landscape, in an amount not to exceed a potential total of $106,304.37, for maintenance at six resource management sites. |
|
8036 |
12/14/09
|
Authorizing execution of a general services contract up to four years with Signature Landscape, in an amount not to exceed a potential total of $111,963.59, for maintenance at three resource management sites. |
|
8037 |
12/14/09 |
Authorizing execution of two five-year Lease Agreements, with an automatic five-year extension, with Sprint Spectrum Realty Company, L.P. at the Clyde Hill Water Reservoir Site, located at 2200 96th Avenue NE, Clyde Hill, Washington and the Lakemont 1150 Reservoir site, located at 16859 SE 59th Street, Bellevue, Washington. |
|
8038 |
12/14/09 |
Adopting the City of Bellevue State Legislative Agenda and State Legislative Statement of Policy for the 2010 legislative session. |
|
8039 |
01/25/10 |
Supporting Bellevue School District Propositions 1 (educational programs and operations levy) and 2 (technology and capital projects levies) on the February 9, 2010 special election ballot. |
|
8040 |
01/25/10 |
Supporting Issaquah School District Propositions 1 (replacement of maintenance and operations levy), 2 (capital projects levies), and 3 (school bus levy) on the February 9, 2010 special election ballot. |
|
8041 |
02/01/10 |
Authorizing execution of a four-year General Services Agreement with Consolidated Press for web press printing services |
|
8042 |
02/01/10 |
Authorizing execution of a renewal of a two-year General Services Contract with Malone’s Landscape Management for landscaping services at various park sites |
|
8043 |
02/01/10 |
Authorizing the execution of all documents necessary for the purchase of the Chapel LLC Property (King County Assessor’s Tax No. 042405-9002) |
|
8044 |
02/01/10 |
Authorizing the execution of all documents necessary for the purchase of the Tyler Homes Corporation Property (King County Assessor’s Tax No. 202405-9018) |
|
8045 |
02/16/10 |
Adopting the City of Bellevue Federal Legislative Agenda for the 2010 |
|
8046 |
03/01/10 |
Authorizing the Finance Director to write off certain uncollectible accounts |
|
8047 |
02/16/10 |
Authorizing a four-year Interlocal Agreement with the City of Mercer Island for Marine Patrol Services on Lake Washington |
|
8048 |
02/16/10 |
Authorizing the execution of a professional services agreement with Northwest Hydraulic Consultants for the Bel-Red Corridor Hydrology and Hydraulic Analysis of West Tributary and Goff Creek |
|
8049 |
03/01/10 |
Authorizing a contract with Cummins Northwest, Inc. for the purchase of three multi-voltage emergency generators |
|
8050 |
03/01/10 |
Authorizing execution of a two-year General Services Agreement with Automated Funds Transfer Services (AFTS) for printing and mailing services |
|
8051 |
03/01/10 |
Authorizing execution of a Third Amendment to the Professional Services Agreement between the City of Bellevue and Cabot Dow for labor agreement negotiations and other legal services related to union matters |
|
8052 |
03/01/10 |
Authorizing an agreement with GeoAnalytics for the purchase of address and parcel creation and maintenance software |
|
8053 |
03/01/10 |
Authorizing a five-year Lease Agreement with New Cingular Wireless, PCS, LLC at Coal Creek Natural Area |
|
8054 |
03/01/10 |
Authorizing execution of a General Services Contract up to four years with Teufel Nurseries for landscaping services at various City locations |
|
8055 |
03/01/10 |
Authorizing execution of a renewal of a two-year General Services Contract with Total Landscape for landscaping services at various City locations |
|
8056 |
03/01/10 |
Authorizing the execution of a professional services agreement with Otak, Inc., for engineering services for the Valley Creek at NE 20th Street and Kelsey Creek at 140th Avenue NE Fish Passage Improvement Projects |
|
8057 |
03/15/10 |
Authorizing execution of a 2009 through 2011 Successor Labor Agreement by and between the City of Bellevue and the International Association of Fire Fighters Union, Local #1604 representing the Fire Prevention Officers |
|
8058 |
03/15/10 |
Authorizing execution of a 2010 through 2012 successor labor agreement by and between the City of Bellevue and the Bellevue Police Support Guild, representing Police Support and Clerical employees |
|
8059 |
03/15/10 |
Authorizing an Interagency Agreement with King County for the design and construction of a joint sewer project to upsize their Bellevue Influent Trunk with the City of Bellevue’s project to increase the capacity of the West CBD Trunk |
|
8060 |
03/15/10 |
Authorizing approval of payment of a claim against the City for property damage to the Breckenridge residence caused by a storm drain system failure |
|
8061 |
03/15/10 |
Authorizing the approval of payment of a claim against the City for damage to the property of Scott and Jennifer Robertson caused by water system failures |
|
8062 |
03/15/10 |
Authorizing the annual report documents (City of Bellevue 2009 Compliance Report and 2010 Stormwater Management Program) required by the National Pollutant Discharge Elimination System (NPDES) Phase II Municipal Stormwater Permit for submittal to the Washington State Department of Ecology by the March 31, 2010 deadline |
|
8063 |
04/19/2010 |
Authorizing an amendment to a professional services agreement with Hillis, Clark, Martin, & Peterson to increase the contract amount for legal services (CIP PW-R-159). |
|
8064 |
04/05/2010 |
Authorizing execution of a two-year contract, with an option to renew for an additional two years with CCS Printing in an amount not to exceed $300,000, for outsourced printing services. |
|
8065 |
04/05/2010 |
Authorizing execution of a two-year contract, with an option to renew for an additional two years, with Olympus Press in an amount not to exceed $300,000, for outsourced printing services. |
|
8066 |
04/05/2010 |
Authorizing execution of a two-year contract, with an option to renew for an additional two years, with Capitol City Press in an amount not to exceed $300,000.00, for outsourced printing services |
|
8067 |
04/05/2010 |
Authorizing execution of a two-year contract, with an option to renew for an additional two years with Printex Press in an amount not to exceed $300,000.00, for outsourced printing services |
|
8068 |
04/05/2010 |
Authorizing execution of a two-year contract, with an option to renew for an additional two years, with Copiers NW in an amount not to exceed $300,000.00, for outsourced printing services |
|
8069 |
04/05/2010 |
Authorizing the execution of a two-year General Services Contract with GCA Services Group, Inc., for a total contract amount not to exceed $58,675, for janitorial services at the Lewis Creek Visitor Center, Lake Hills Community Center, Lake Hills Ranger Station, and Resource Management facility |
|
8070 |
04/05/2010 |
Authorizing the execution of a professional services agreement with Herrera Environmental, for engineering services for the Upper Vasa Creek Check Dam Repairs project in an amount not to exceed $123,700.00 (CIP Plan No. D-59) |
|
8071 |
04/05/2010 |
Designating a recovery zone for purposes of Sections 1400U-1, 1400U-2 and 1400U-3 of the Internal Revenue Code of 1986, as amended, and the American Recovery and Reinvestment Act of 2009 for the purpose of issuing bonds |
|
8072 |
04/05/2010 |
Authorizing all documents necessary to enter into Agreements for the funding of affordable housing projects, as recommended by the ARCH Executive Board, utilizing funds from the City’s Housing Fund and CDBG funds |
|
8073 |
04/05/2010 |
Authorizing all documents necessary to enter into Agreements for the funding of affordable housing projects, as recommended by the ARCH Executive Board, utilizing funds from the City’s Housing Fund and CDBG funds |
|
8074 |
04/05/2010 |
Authorizing all documents necessary to enter into Agreements for the funding of the House Key Plus ARCH Down Payment Assistance Program, as recommended by the ARCH Executive Board, utilizing funds from the City’s Housing Fund. |
|
8075 |
04/05/2010 |
Approving the 2010 ARCH Budget and Work Plan. |
|
8076 |
04/05/2010 |
Authorizing execution of the Amended and Restated ARCH Interlocal Agreement providing for centralized administration of the ARCH Housing Trust Fund |
|
8077 |
04/19/2010 |
Authorizing the execution of a professional services agreement with Parametrix for the Lakemont Sand Filter Wetpond Retrofit project. |
|
8078 |
04/19/2010 |
Authorizing the execution of a professional services agreement with Herrera Environmental Consultants for the East Creek and Richards Creek Fish Passage Improvement and Stream Modification Project. |
|
8079 |
04/19/2010 |
Ratifying the Emergency Declaration for construction of emergency public works to address water main breaks on NE 26th Street and 166th Ave. NE (Ardmore Neighborhood). |
|
8080 |
04/19/2010 |
Authorizing execution of a Consultant Agreement with PB Americas, Inc. to complete the final design and prepare plans, specifications and estimates to advance implementation of the NE 4th Street Extension from 116th to 120th Avenues NE (CIP Plan No. PW-R-160). |
|
8081 |
04/19/2010 |
Authorizing a Consultant Agreement with The Transpo Group Inc. to conduct a traffic assessment and public involvement process supporting a traffic calming plan for NE 5th Street (from 120th to 124th Avenues NE) to serve as mitigation for potential impacts anticipated as a result of the NE 4th Street Extension. |
|
8082 |
05/03/2010 |
Authorizing professional services contract for four years with Wellspring Family Services for the Employee Assistance Program. |
|
8083 |
05/03/2010 |
Adopting the 2010 Bellevue Parks & Open Space System Plan. |
|
8084 |
05/03/2010 |
Authorizing a four-year General Services Contract with Varsity Contractors Inc. for carpet and upholstery cleaning services at 27 park facilities. |
|
8085 |
05/03/2010 |
Authorizing the fifth amendment to the interlocal agreement for Marine Patrol Services with the King County Sheriff’s Office (KCSO). |
|
8086 |
05/03/2010 |
Adopting the City of Bellevue 2011-2016 Transportation Improvement Program (TIP). |
|
8087 |
05/03/2010 |
Authorizing an amendment to the Interlocal Agreement with King County for the housing of Bellevue inmates in the King County Jail through 2016. |
|
8088 |
05/03/2010 |
Ratifying the amendment of the Countywide Planning Policies updating existing policies to provide for housing and employment targets for the period 2006-2031, including Table LU-1 Housing and Employment Growth Targets (2006-2031). |
|
8089 |
05/17/2010 |
Authorizing a Professional Services Agreement with Arthur J. Gallagher Risk Management Services, Inc. to provide insurance advisor and brokerage services. |
|
8090 |
05/17/2010 |
Authorizing a two-year General Services Contract with DW Close Company, with an option to renew for an additional two years for on-call electrical services. |
|
8091 |
05/17/2010 |
Authorizing a two-year General Services Contract, with Dutton Electric, with an option to renew for an additional two years for on-call electrical services. |
|
8092 |
05/17/2010 |
Authorizing a two-year General Services Contract with Nelson Electric, with an option to renew for an additional two years for on-call electrical services. |
|
8093 |
05/17/2010 |
Authorizing a two-year General Services Contract with Prime Electric, with an option to renew for an additional two years for on-call electrical services. |
|
8094 |
05/17/2010 |
Authorizing a two-year General Services Contract with Wave Electric, with an option to renew for an additional two years for on-call electrical services. |
|
8095 |
05/17/2010 |
Authorizing an agreement with the Washington State Military Department to accept grant funds for emergency management purposes. |
|
8096 |
05/17/2010 |
Authorizing a four-year General Services Contract with Guardian Security Systems Inc. for alarm monitoring services and annual confidence testing at 33 park buildings. |
|
8097 |
05/17/2010 |
Authorizing the amended and restated Interlocal Cooperative Agreement (ICA) to maintain the multi-jurisdictional Eastside Narcotics Task Force (ENTF) with the Cities of Bellevue, Kirkland, Mercer Island, Redmond, the King County Sheriff’s Office, and adding the Washington State Patrol. |
|
8098 |
05/17/2010 |
Authorizing a contract supplement with INCA Engineering Inc. to prepare conceptual engineering design for 120th Avenue NE, NE 8th Street to NE 12th Street. |
|
8099 |
05/17/2010 |
Authorizing a sixth amendment to the Professional Services Agreement with Patterson Buchanan Fobes Leitch & Kalzer, Inc., P.S. to increase the total contract amount for legal services in the lawsuit Moon v. City of Bellevue, King County Superior Court cause no: 07-2-10772-0 SEA. |