Medium Project (BM)
|
| Please Note: The following are the materials, fees, and timeline that typically apply to an application of this type. This information is a general guide and should not be used as a substitute for current codes and regulations. Before applying for a permit, contact Permit Processing (425-452-4898 or permittech@bellevuewa.gov) with your project details to verify that this is the correct application type and for any other submittal information. |
| Submittal Chart |
For definitions, numbers of copies to submit, and other important information.
Large Commercial, Multifamily, and Duplex Building Permits |
| Submittal Description Sheets |
1 Standards for Plans and Drawings 2 Boundary & Topographic Survey 3b Site Plan B 9 Floor Plan 10 Building Elevations 11 Cross Sections and Details 12 Door, Window, Finish Schedules, Roof, Deck, and Floor Framing Plans 13 Foundation Plan 15 Structural Notes 20 Construction Stormwater Pollution Prevention Plan (CSWPPP) 21 Road Plan 22b Final Landscape Plan - Exterior Lighting Plan 23a Preliminary Street Lighting Plan 23b Street Lighting Plan 25 Geotechnical Report 34b Commercial Energy Code Data Sheet (Commercial Only) 41 Billing System 42a Conceptual Smoke Control Submittal 42b Detailed Smoke Control Submittal 42c Smoke Control System Revisions 42d Shaft Pressurization-Only Systems 44 Slope Categories Drawing (if slopes greater than 15% exist) 47 Value of Improvements (Additions only) |
| Forms |
Building Permit Application Bill To Demolition/Abandonment of Water/Sewer Service (if permit includes demo, fill out in triplicate) Electrical Plan Review Submittal Guide/Checklist 2008 Electrical Code--Change Notice |
| Fees |
Commercial & Multifamily Construction Permits Valuation Sheet (or use the Construction Valuation Table ) |
| Target Processing Timeline |
49 Calendar Days |
Actual Processing Timeline (updated weekly) |
Medium Project (BM) |