Resolution Number |
Adopted Date |
Summary |
| 8500 |
01/07/2013 |
Authorizing execution of a two-year General Services Contract with Total Landscape Corporation, with the option to renew for an additional two years, for landscaping services at various street tree and arterial landscape, natural resource trails, and nature park Visitor Center sites. |
| 8501 |
01/07/2013 |
Authorizing the execution of a grant agreement (and supplements if necessary) with the Washington State Department of Transportation, in the amount of $1,100,686, for the acceptance of federal Surface Transportation Program funding to support the construction phase of 120th Avenue NE – Stage 2 – from NE 8th to NE 12th Streets (CIP Plan No. PW-R-164). |
| 8502 |
01/07/2013 |
Authorizing the execution of a grant agreement (and supplements if necessary) with the Washington State Department of Transportation, in the amount of $450,000 for the acceptance of federal Surface Transportation Program funding for the Factoria Boulevard (SE 36th Street to SE 41st Place) Overlay project within the annual Overlay Program (CIP Plan No. PW-M-1). |
| 8503 |
01/07/2013 |
Authorizing the execution of a professional services agreement with HDR Engineering, Inc. (HDR) in an amount not to exceed $125,000 (CIP Plan No. S-16) for engineering services for the 2013 Wastewater Pump Station Evaluation. |
| 8504 |
01/07/2013 |
Authorizing the execution of a professional services agreement with Osborne Consulting, Inc. in an amount not to exceed $420,000 (CIP Plan No.S-24) for engineering services for the Sanitary Sewer Repair Design 2013-2017. |
| 8505 |
01/22/2013 |
Authorizing execution of a four-year Agreement with Evergreen Adjustment Services, Inc., in a total contract amount not to exceed $100,000, to provide liability claims adjustment services. |
| 8506 |
01/22/2013 |
Authorizing the execution of a four-year professional services contract with Systems Design, to provide Basic Life Support (BLS) patient transport billing services, in an amount not to exceed $300,000. |
| 8507 |
01/22/2013 |
Authorizing the execution of a five-year lease agreement with the Eastside Heritage Center (EHC) for a portion of the historic McDowell House property located at 11660 Main Street. |
| 8508 |
01/22/2013 |
Authorizing the City Manager or his designee to execute an amendment to the Professional Services Agreement with MulvannyG2 in an amount not to exceed $101,000 for a total contract amount of $150,000 (CIP Plan No. PW-R-159), to provide continued planning and architectural services related to City Hall and other City facilities potentially impacted by the East Link project. |
| 8509 |
02/04/2013 |
Approving the 2013 ARCH Budget and Work Plan. |
| 8510 |
02/04/2013 |
Authorizing the execution of all documents necessary to enter into an agreement for the Imagine Housing Totem Lake (Phase 2) Senior Apartments, as recommended by the ARCH (A Regional Coalition for Housing) Executive Board, utilizing funds from the City’s Housing Fund. |
| 8511 |
02/04/2013 |
Authorizing the execution of all documents necessary to enter into an agreement for the Friends of Youth Transitional Housing for Homeless Young Adults, as recommended by the ARCH (A Regional Coalition for Housing) Executive Board, utilizing funds from the City’s Housing Fund and/or the Operating Grants and Donations Fund. |
| 8512 |
02/19/2013 |
Ratifying the proposed 2012 King County Countywide Planning Policies updating existing policies, including appendices and map amendments. |
| 8513 |
02/19/2013 |
Determining the anticipated shortfall in revenues for providing municipal services to the Eastgate Annexation Area, continuing the sales and use tax rate established by Ordinance 6045, as amended, pursuant to the authority in RCW 82.14.415 |
| 8514 |
02/19/2013 |
Authorizing execution of a two-year Maximo software maintenance agreement and a two-year Technical Services Agreement with Interloc Solutions Inc., in an amount not to exceed $279,200, plus taxes if applicable, for ongoing development and consulting services |
| 8515 |
02/19/2013 |
Authorizing the execution of a Memorandum of Understanding (MOU) by and between the City of Bellevue (City) and the International Brotherhood of Electrical Workers Local 77, representing staff in the Traffic Signals Shop and Electronic Communications Shop (Union), for a one-year labor agreement extension, including an agreement to take furloughs in combination of giving back paid leave. The contract extension is January 1, 2014 - December 31, 2014 |
| 8516 |
02/19/2013 |
Authorizing the execution of a professional services agreement with David A. Clark Architects in an amount not to exceed $197,057 (CIP Plan No.P-R-2) to provide design development documents, construction documents, bidding documents and process assistance, construction inspections, submittal review, and a cost estimate for the Bellevue Golf Course driving range building expansion. |
| 8517 |
02/19/2013 |
Authorizing execution of 1) amendment #3 to the Interlocal Agreement between the Washington State Department of Transportation and the City of Bellevue for final design of pedestrian and bicycle improvements along Northup Way (GCA 6668, SR 520 Interim Regional Pedestrian and Bicycle Path); and 2) amendment #2 to the consultant agreement with Jacobs Engineering Group Inc., in an amount not to exceed $656,631 (plus any applicable taxes), to advance the design from 60% to final design for the Northup Way Corridor Improvements, 108th Avenue NE to NE 24th Street (CIP Plan No. PW-R-146). |
| 8518 |
Postponed |
Authorizingthe execution of a consultant contract with LMD to provide planning, architectural analysis and urban design services related to Downtown Livability Initiative/Land Use Code update. |
| 8519 |
02/25/2013 |
Authorizing the execution of the Agreed Order for Immediate Possession and Use with King County for acquisition of property rights necessary for the NE 4th Street Extension Project, Phase 1, extending NE 4th Street from 116th Avenue NE to the eastern boundary of the Burlington Northern Santa Fe (BNSF) Railway Corridor |
| 8520 |
02/25/2013 |
Supporting the County-Wide 2014-2019 Medic One/Emergency Medical Services (EMS) Levy. |
| 8521 |
03/04/2013 |
Ratifying the execution of: 1) an Amended and Restated Eastside Public Safety Communications Agency (EPSCA) Interlocal Agreement; and 2) the related Articles of Incorporation. |
| 8522 |
03/04/2013 |
Authorizing the execution of a Settlement Agreement with Sound Transit for acquisition of property rights or approvals necessary for the NE 4th Street Extension Project, Phase 1, extending NE 4th Street from 116th Avenue NE to the eastern boundary of the Burlington Northern Santa Fe (BNSF) Railway Corridor. |
| 8523 |
03/04/2013 |
Adopting the City of Bellevue Federal Legislative Agenda for the 2013 legislative session. |
| 8524 |
03/04/2013 |
Amending the adopted City of Bellevue State Legislative Agenda for the 2013 legislative session. |
| 8525 |
03/04/2013 |
Authorizing the execution of a two-year purchasing agreement, with the option to renew for four periods of two years each, with Municipal Emergency Services, Inc., (MES) for the purchase and delivery of Scott Self-Contained Breathing Apparatus (SCBA) required for use by the Bellevue Fire Department. |
| 8526 |
03/04/2013 |
Authorizing execution of a general services contract with King County Metro-Rapid Ride, in an amount not to exceed $120,000, plus taxes if applicable, for the installation of fiber optic cable. |
| 8527 |
03/04/2013 |
Authorizing execution of a two-year Technical Services Agreement with CSDC Systems Inc., with the option to renew for an additional two year period, in an amount not to exceed a total of $160,000, plus taxes if applicable, for ongoing AMANDA Permitting System development and consulting services on an as-needed basis. |
| 8528 |
03/04/2013 |
Authorizing execution of a Contract with Cornerstone General Contractors, Inc., in the amount of $9,358,578, to construct the Visitor Center and site improvements at the Bellevue Botanical Garden (BBG). |
| 8529 |
03/04/2013 |
Authorizing the execution of a four-year lease agreement with Cascade Canoe and Kayak, Inc. (Cascade) for use of a portion of the Enatai Beach Park and Boathouse located at 3519 108th Avenue SE. |
| 8530 |
03/04/2013 |
Authorizing execution of a Contract with Pease Construction, Inc., in an amount not to exceed $8,803,207, to construct the Bellevue Youth Theatre at Crossroads Park |
| 8531 |
03/04/2013 |
Authorizing the execution of a consultant agreement with Reid Middleton, Inc., in an amount not to exceed $169,481.40, to prepare a design alternative analysis for the proposed improvements at the intersection of Lakemont Boulevard/Cougar Mountain Way/SE 63rd Street (CIP Plan No. PW-I-92). |
| 8532 |
03/04/2013 |
Authorizing the execution of a Quit Claim Deed to transfer a portion of Northup Way right-of-way to the Washington State Department of Transportation (WSDOT) as part of the SR 520 Eastside Transit and High Occupancy Vehicle (HOV) improvement project, and waiving compensation because the transfer of the proposed right-of-way is in the public’s interest and advantage. |
| 8533 |
03/04/2013 |
Authorizing execution of amendment #2 to the Professional Engineering Services Agreement with HDR Engineering, Inc., (Clerk’s receiving No. 47737) increasing the total contract amount from $1,568,776 to $3,694,986, to advance design on the 124th Avenue NE Improvements projects, NE 14th Street to Northup Way (CIP Plan No. PW-R-166), and NE 12th Street to NE 14th Street (CIP Plan No. PW-R-169). |
| 8534 |
03/04/2013 |
Authorizing the execution of a Professional Engineering Services Agreement with HDR Engineering, Inc., in an amount not to exceed $2,108,799, to complete 60% Preliminary Engineering Plans, Specifications, and Estimates (PS&E) for the planned NE 15th Street roadway improvements between 116th Avenue NE and 120th Avenue NE (CIP Plan No.PW-R 172) and improvements between 120th Avenue NE and 124th Avenue NE, (CIP Plan No. PW-R-173) |
| 8535 |
03/04/2013 |
Authorizing execution of a consultant agreement with Parametrix, in an amount not to exceed $446,234, to develop preliminary designs for the 130th Avenue NE project between Bel-Red Road and NE 20th Street (CIP Plan No. PW-R-170), and the NE 16th Street project between 130th Avenue NE and 132nd Avenue NE (CIP Plan No. PW-R-174). |
| 8536 |
03/04/2013 |
Authorizing approval of payment of $65,820.32 for a Release of All Claims in final settlement of a claim against the City for property damage to the Perez/Ambrocio residence caused when a water main was accidentally damaged by City Surface Water crews during installation of a new drainage structure. |
| 8537 |
03/04/2013 |
Authorizing the execution of all documents necessary for approval of a total payment in the amount of $750,000 to implement settlement of the lawsuit for personal injury damages filed by Evelyn Rissman. |
| 8538 |
03/18/2013 |
Authorizing the execution of documents for the acquisition of property rights from SPIX/BALL LLC, in an amount not to exceed $55,690 and for the acquisition of property rights from Vasa Park Home Association of Washington, in an amount not to exceed $74,683, for construction of CIP Project No. PW-R-141, West Lake Sammamish Parkway SE, Phase 1, 1-90 Roundabout to SE 34th Street. |
| 8539 |
03/18/2013 |
Authorizing execution of an amendment to the Professional Services Agreement with Reid Middleton, Inc., (Clerk’s receiving No. 48745) increasing the total contract amount from $50,000 to $350,000, for building plan review services. |
| 8540 |
03/18/2013 |
Authorizing execution of an amendment to the Professional Services Agreement with Lani O’Connor, (Clerk’s receiving No. 48756) increasing the total contract amount from $50,000 to $150,000, for building plan review services. |
| 8541 |
03/18/2013 |
Authorizing execution of an amendment to the Professional Services Agreement with Kolke Consulting, (Clerk’s receiving No. 48742) increasing the total contract amount from $50,000 to $150,000, for building plan review services. |
| 8542 |
03/18/2013 |
Authorizing execution of an amendment to the Professional Services Agreement with Geo Engineers, (Clerk’s receiving No. 48566) increasing the total contract amount from $50,000 to $150,000, for building plan review services. |
| 8543 |
03/18/2013 |
Authorizing the execution of a professional services agreement with Maffei Structural Engineering in an amount not to exceed $300,000 for building plan review services. |
| 8544 |
03/18/2013 |
Authorizing the execution of a two-year Professional Services Agreement with R. Lee Springer, with the option to renew for an additional two years, in a total amount not to exceed $200,000 to perform audits of businesses to determine compliance with the tax chapters of the Bellevue City Code. |
| 8545 |
03/18/2013 |
Authorizing the execution of a two-year Professional Services Agreement with Anthony Kopczynski, with the option to renew for an additional two years, in a total amount not to exceed $200,000 to perform audits of businesses to determine compliance with the tax chapters of the Bellevue City Code. |
| 8546 |
03/18/2013 |
Authorizing the execution of a two-year Professional Services Agreement with Roberto de las Alas, with the option to renew for an additional two years, in a total amount not to exceed $200,000 to perform audits of businesses to determine compliance with the tax chapters of the Bellevue City Code. |
| 8547 |
03/18/2013 |
Authorizing the execution of a professional services agreement with Denovo Ventures, LLC, in an amount not to exceed $210,000, for configuration, consulting and programming services for the upgrade of the JD Edwards Enterprise One Application. |
| 8548 |
03/18/2013 |
Authorizing execution of an Enterprise License Agreement with Environmental Systems Research Institute, Inc. (Esri), for the licensing and deployment of Geographic Information Systems (GIS) mapping software and services for the City, including training and technical support, in an amount not to exceed a total of $300,000. |
| 8549 |
03/18/2013 |
Authorizing the execution of Amendment No. 3 to the Marymoor Park Interlocal Agreement with King County, a political subdivision of the State of Washington, in an amount not to exceed $315,176 for a five-year term, for the maintenance and operation of the Bellevue/King County Marymoor Ballfield Complex. |
| 8550 |
03/18/2013 |
Authorizing execution of the King County Investigative Response Team (KCIRT) Interlocal Agreement between the City and the Washington State Patrol, the King County Sheriff, and the cities of Black Diamond, Bothell, Issaquah, Kirkland, Mercer Island, Redmond and Snoqualmie to provide mutual aid and mobilization in the event of a law enforcement involved fatality or serious injury incidents; and repealing Resolution No. 8433 approving the execution of a KCIRT Interlocal Agreement and declaring said KCRIT Interlocal Agreement executed by the City null and void. |
| 8551 |
03/18/2013 |
Certifying the City Manager or his designee to sign and certify the annual report documents (City of Bellevue 2012 Compliance Report and 2013 Stormwater Management Program) required by the National Pollutant Discharge Elimination System (NPDES) Phase II Municipal Stormwater Permit for submittal to the Washington State Department of Ecology by the March 31, 2013 deadline. |
| 8552 |
03/18/2013 |
Authorizing approval of payment in the amount of $35,532.63 for a Release of All Claims in final settlement of a claim against the City for property damage to the Poseukov/Tayko residence caused when a water main was accidently damaged by the City Surface Water crews during installation of a new drainage structure. |
| 8553 |
04/01/2013 |
Amending the adopted City of Bellevue Federal Legislative Agenda for the 2013 legislative session |
| 8554 |
04/01/2013 |
Authorizing the Finance Director to write-off fifty-one uncollectible accounts totaling $88,760.29. |
| 8555 |
04/01/2013 |
Authorizing execution of a two-year General Services Contract with Behavioral Interventions (BI) Inc., in an amount not to exceed $93,000, with the option to renew for an additional two years, for the Bellevue Electronic Home Detention Program. |
| 8556 |
04/01/2013 |
Authorizing the execution of a professional services agreement with Hayre McElroy & Associates in an amount not to exceed $149,054 to complete materials testing and inspection services required to construct the Visitor Center and site improvements at the Bellevue Botanical Garden (BBG). |
| 8557 |
04/01/2013 |
Authorizing the execution of a Professional Services Agreement with Makers Architecture and Urban Design, LLP in an amount not to exceed $220,000 to provide planning, architectural analysis, and urban design services related to the Downtown Livability Initiative/Land Use Code Update. |
| 8558 |
04/01/2013 |
Authorizing execution of a construction inspection services contract with Jacobs Project Management Co., in an amount not to exceed $200,000, to provide on-call construction inspection and support for the West Lake Sammamish Parkway Improvements Phase I, I-90 Roundabout to SE 34th Street project (CIP Plan No. PW-R-141), and other 2013 construction projects as needed to insure proper construction inspection and management. |
| 8559 |
04/01/2013 |
Authorizing execution of a construction inspection services contract with Kristen Betty & Associates Inc., in an amount not to exceed $200,000, to provide on-call construction inspection and support for the NE 4th Street Extension-Stage I, 116th Avenue NE to Burlington Northern Santa Fe Railroad ROW project (CIP Plan No. PW-R-160), and other 2013 construction projects as needed to insure proper construction inspection and management. |
| 8560 |
04/01/2013 |
Authorizing execution of Amendment #2 to the Professional Engineering Services Agreement with Parsons Brinkerhoff, Inc., increasing the contract amount by $2,455,157.57 for a contract total of $5,410,632.75, to develop the final design for 120th Avenue NE, Stage 3 from NE 12th Street to Northup Way (CIP Plan No. PW-R-168), including the preparation of construction contract documents for the full implementation of 120th Avenue NE between NE 12th Street and NE 16th Street. |
| 8561 |
04/01/2013 |
Authorizing execution of amendment #7 to a purchase agreement with Transcore ITS, LLC, in an amount not to exceed $473,000, to install Phase 4 of the SCATS traffic adaptive signal control system in Crossroads, Bel-Red, and West Bellevue and key corridors NE 20th Street, 156th Avenue NE, Bel-Red Road, 140th Avenue NE/SE and Bellevue Way SE. |
| 8562 |
04/01/2013 |
Authorizing and directing execution of a Service Agreement with King County Flood Control District, King County, and the City of Bellevue for reimbursement of costs associated with the Lower Coal Creek Flood Hazard Reduction Alternatives Analysis, in an amount not to exceed $365,000 (CIP Plan No. D-106). |
| 8563 |
04/01/2013 |
Authorizing the execution of a two-year General Services Agreement with Davidson-Macri Sweeping Inc., in an amount not to exceed $100,000 with the option to renew for an additional two years with a total contract value not to exceed $200,000 to perform citywide pipeline root removal and cleaning. |
| 8564 |
04/01/2013 |
Authorizing the execution of a professional services agreement with CH2MHill, in an amount not to exceed $175,000 (CIP Plan No. D-103 and Parks Levy-Trail and Natural Areas P-AD-89) for the Coal Creek Culvert Replacement Project. |
| 8565 |
04/01/2013 |
Authorizing the execution of a Purchase Agreement with Russelectric Incorporated, in an amount not to exceed $331,652, plus applicable sales tax, for the purchase and installation of the Emergency Power Switchgear at City Hall. |
| 8566 |
04/01/2013 |
Approving an Agreement for Separation From Service for City Manager Steven R. Sarkozy and authorizing the Mayor to sign said Agreement on behalf of the City of Bellevue. |
| 8567 |
04/01/2013 |
Designating Brad Miyake to perform the duties of the City Manager pursuant to RCW 35A.13.150(2) (i.e. designated Acting Ctiy Manager) effective May 16, 2013. |
| 8568 |
04/15/2013 |
Authorizing the four-year professional services agreement with Kleinfelder West, for on-call geotechnical services |
| 8569 |
04/15/2013 |
Authorizing the four-year professional services agreement with Landau Associates, for on-call geotechnical services |
| 8570 |
04/15/2013 |
Authorizing the four-year professional services agreement with Terracon Consultants, for on-call geotechnical services |
| 8571 |
04/15/2013 |
Authorizing the four-year professional services agreement with HWA Geosciences, for on-call geotechnical services |
| 8572 |
04/15/2013 |
Authorizing the four-year professional services agreement with GeoEngineers, for on-call geotechnical services. |
| 8573 |
04/15/2013 |
Authorizing a professional services agreement with Terracon Consultants, Inc., in an amount not to exceed $140,139, to perform third party materials testing and inspection and turbidity monitoring services required to construct the Bellevue Youth Theatre (BYT). |
| 8574 |
04/15/2013 |
Authorizing an Interlocal Agreement between Bellevue and the cities and organizations of Kent, Kirkland, Mountlake Terrace, Port of Seattle, Renton, Tukwila, Woodinville, Seattle Parks and Recreation, University of Washington, USDA Wildlife Services and the US Fish and Wildlife Service, in the amount of $2,230, for waterfowl management. |
| 8575 |
04/15/2013 |
Authorizing the execution of a professional services agreement with Northwest Hydraulics Consultants, in an amount not to exceed $365,000 for engineering services for Lower Coal Creek Flood Hazard Reduction Alternatives Analysis (CIP Plan No. D-106). |
| 8576 |
04/22/2013 |
Related to Sound Transit’s East Link light rail project identifying the City of Bellevue’s preferred Cost Savings options modifying the East Link project; declaring any project to widen Bellevue Way from the “Y” with 112th Avenue SE to the South Bellevue Park & Ride to be a City project; directing the City Manager or his designee to develop amendments to the Umbrella Memorandum of Understanding with Sound Transit consistent with the City’s preferred Cost Savings options; directing the City Manager or his designee to develop amendments to the Transit Way Agreement with Sound Transit consistent with the City’s preferred Cost Savings options; and approving the East Link project alignment, as modified by the City’s preferred Cost Savings options for the purposes of the Light Rail Overlay District, Part 20.25M, of the Bellevue Land Use Code. |
| 8577 |
05/06/2013 |
Authorizing execution of an Amendment to the Professional Services Agreement with TCA Architecture Planning, Inc., increasing the contract amount by $93,328 for a contract total of $141,644, for additional architectural and engineering services for the construction phase of Fire Training Tower structural modifications and installation of gas fired burn props. |
| 8578 |
05/06/2013 |
Authorizing the execution of a two-year professional services agreement with Protocol Property Management, in an amount not to exceed $155,000, for the management of 18 residential rental properties. |
| 8579 |
05/06/2013 |
Authorizing execution of an Amendment to the Professional Services Agreement with Epicenter Services, LLC increasing the contract amount by $25,000 for a contract total of $74,238, for consultant services associated with research, development and procurement of the 2014 Comprehensive Garbage, Recyclables and Organics Collection Contract. |
| 8580 |
05/06/2013 |
Authorizing the execution of a professional services agreement with CHS Engineers, LLC, in an amount not to exceed $300,000 (CIP Plan Nos. D-64 and S-24) for engineering services for the Trenchless Utility Repairs – Design Services project. |
| 8581 |
05/06/2013 |
Authorizing approval of payment in the amount of $72,463.57 for a Release of All Claims in final settlement of a claim against the City for property damage to the Tessier residence caused when a water main broke with a landslide. |
|
8582 |
05/13/2013 |
Authorizing the execution of the renewal of the City’s current Electrical Franchise Agreement with Puget Sound Energy. |
| 8583 |
05/20/2013 |
Authorizing the execution of a professional services agreement with Schreiber Starling & Lane Architects in an amount not to exceed $237,562 for Fire Facilities Long Range Plan. |
| 8584 |
05/20/2013 |
Authorizing the execution of a General Services Agreement with Myers Sculpture, in an amount not to exceed $118,187, plus applicable taxes, to fabricate and install three art elements in the Newport Hills neighborhood business district on 119th Avenue SE between SE 58th and SE 60th (CIP Plan Nos. CD-11 Public Art Program, CDE 17 Gateways and Neighborhood Identity, and CD-22 Enhanced ROW and Urban Boulevards). |
| 8585 |
05/20/2013 |
Authorizing the execution of a professional services agreement with Murray, Smith & Associates, Inc., in an amount not to exceed $600,000 for the Sanitary Sewer Pipeline Replacement Project (CIP Plan No. S-66). |
| 8586 |
05/20/2013 |
Authorizing the execution of a professional services agreement with Jacobs Project Management Company, in an amount not to exceed $300,000 for on-call construction management and inspection services for various Utilities CIP programs (CIP Plan Nos. D-6, S-24 and W-16). |
| 8587 |
05/20/2013 |
Authorizing the execution of a one-year General Services Agreement with Bravo Environmental NW, Inc., in an amount not to exceed $125,000 with three options to renew for additional one year periods with a total contract value not to exceed $500,000 to perform storm drainage condition assessment. |
| 8588 |
05/20/2013 |
Authorizing approval of payment in the amount of $29,542.43 for a Release of All Claims in final settlement of a claim against the City for property damage to the Brar rental property caused by a water system failure. |
| 8589 |
05/20/2013 |
Authorizing approval of payment in the amount of $30,224.62 for a Release of All Claims in final settlement of a claim against the City for property damage to the McDonald residence caused by a wastewater system failure. |
| 8590 |
05/20/2013 |
Authorizing the execution of all documents necessary for approval of payment in the amount of $90,000 to implement settlement of the lawsuit filed by King County against the City of Bellevue. |
| 8591 |
06/03/2013 |
Authorizing the execution of all documents necessary for approval of a total payment in the amount of $92,500 to implement settlement of the lawsuit for personal injury damages filed by John Jesson. |
| 8592 |
06/03/2013 |
Authorizing an amendment to the City’s current banking contract to allow for two additional 2-year terms and amending annual fees applicable during extension terms. |
| 8593 |
06/03/2013 |
Authorizing execution of a Technical Services Agreement with Covalent Software, Inc., for implementation of hosted service for the Performance Management System, in an amount not to exceed $140,618 and annual maintenance of $35,155. |
| 8594 |
06/03/2013 |
Authorizing the execution of a Memorandum of Understanding (MOU) by and between the City of Bellevue (City) and the Bellevue Police Support Guild (BPSG), establishing wages for the Data Quality Control Specialists and Lead Data Quality Control Specialist for 2012-2013, in final resolution of a grievance that was partially resolved by a Settlement Agreement approved by Council in October 2012 (Resolution No. 8459). |
| 8595 |
06/03/2013 |
Authorizing the adoption of the City of Bellevue’s 2014-2019 Transportation Improvement Program (TIP). |
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|